Great progress is being made at Windsor Girls School, which is a secondary school and sixth form in Windsor, Berkshire.
Working in collaboration with Clarkson Alliance, Edgington, Spink & Hyne, Scott White Hookins and JDP Building Services, MCS has been appointed to design & build a 2-storey 6th form teaching block at Windsor Girls’ School.
The new stand-alone 675m2 sixth form building will feature six classrooms, two offices, a meeting room, a breakout space, and toilet facilities.
Following the completion of the piling, reinforced ground beams were installed to allow for the substructure brickwork, structural steel erection, beam and block floor & Hollowcore plank installation.
Last week the SFS cladding works commenced; which will be followed by the fitting of the brickwork cladding with powder coated aluminium windows and doors.
The inner leaf of the external walls will be constructed in secondary framing steelwork clad in boarding. The internal partitions will be lightweight steel studwork and plasterboard.